Thursday, November 26, 2015

[Avid-L2] Re: Gobble Gobble and Setting Time Base on DPX Sequence

 

DPX frames usually do have metadata burned into them to indicate the appropriate frame rate.  Having said that there is an easy work around to what ever setting that is.

Since MC v8.3 and newer can AMA link to DPX sequences you can AMA link to your frames, go into Source Settings and adjust the frame rate to reflect the clips rate or the project rate.  If you use the project rate it will then do the same as if you were importing a quicktime with "IgnoreQTrate True".

The thing to watch out for is that you cannot re-link subsequently to those frames.  So if it is an offline, you have to deal with it in online.  If you are at the finishing stage, just do it at the full res needed and don't be concerned.

Dave Hogan
Burbank, CA

__._,_.___

Posted by: Dave Hogan <mactvman@yahoo.com>
Reply via web post Reply to sender Reply to group Start a New Topic Messages in this topic (2)
this is the Avid-L2

.

__,_._,___

No comments:

Post a Comment