I'm working on a re-edit of a documentary that was originally done about 5 years ago on FCP. I've brought the latest sequence into Avid via Automatic Duck. So far, so good, the AAF imported flawlessly. But now, since this will be a major overhaul of the sequence, I want to recapture all of the original material (not just the de-composed clips), then relink the converted sequence to the full length clips.
After capturing the first tape, I tried to relink the clips from the AAF sequence, but it didn't work. I noticed that the project association of the tape names is from my newly created Avid project, so I suspect that that doesn't match with the AAF clips.
Is there a way to get my sequence to relink with the newly captured tapes, or will I have to go back and re-capture the de-composed clips from the AAF?
Thanks in advance for any advice.
Steve Pomerantz
Senior (currently on hiatus) Editor
Digital Ranch Productions
Sherman Oaks, CA
------------------------------------
Search the offical complete Avid-L archives at: http://archives.bengrosser.com/avid/
Everything you MUST know about Color Correction in one book: http://tinyurl.com/ColorCorectionforvideo Get your copy todayYahoo! Groups Links
<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/Avid-L2/
<*> Your email settings:
Individual Email | Traditional
<*> To change settings online go to:
http://groups.yahoo.com/group/Avid-L2/join
(Yahoo! ID required)
<*> To change settings via email:
Avid-L2-digest@yahoogroups.com
Avid-L2-fullfeatured@yahoogroups.com
<*> To unsubscribe from this group, send an email to:
Avid-L2-unsubscribe@yahoogroups.com
<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/
No comments:
Post a Comment