Open your 29.97 project.
Link the clip.
Right-click it in the bin and choose Source Settings.
Under playback, you can tell it to play at 29.97 instead of 30.
easy…
On Thu, Jan 11, 2018 at 5:45 PM, Dan McCabe danlist@bestmail.us [Avid-L2] <Avid-L2@yahoogroups.com> wrote:
Dear Mavens,
In the past when I have received stock or animations at 30p I have put them through Cinema Tools and directly changed the speed of the file to 29.97 fps to avoid any bumps on playback. (I've also done that with 25p stock if there was a move so that it is smoother though faster.)
An editor was suggesting that the same net effect is achieved by bringing in a shot into a 30p Avid project and then opening the clip in a 29.97 project. Is that really the case? Does the Avid play back the 30p at 29.97 fps, frame for frame? Or does the 29.97 project eventually drop a frame from the clip to keep the 30p in sync?
Thanks,
Dan
__._,_.___
Posted by: Mark Spano <cutandcover@gmail.com>
Reply via web post | • | Reply to sender | • | Reply to group | • | Start a New Topic | • | Messages in this topic (2) |
Have you tried the highest rated email app?
With 4.5 stars in iTunes, the Yahoo Mail app is the highest rated email app on the market. What are you waiting for? Now you can access all your inboxes (Gmail, Outlook, AOL and more) in one place. Never delete an email again with 1000GB of free cloud storage.
this is the Avid-L2
.
__,_._,___
No comments:
Post a Comment