Wednesday, February 10, 2016

[Avid-L2] frame flex

 

I am just playing around with 8.5 and have a question about frame flex. I right click the source (which is a finished show) and reset the size to fit my project. I get that. But if I want to take some clips within that full clip or show and want to do another size, can I? or do I need to sub clip so Im not affecting the original resize?

thanks
Lou
Lou Wirth Productions
500Tamal Plaza, Suite 522
Corte Madera, CA 94925
www.louwirth.com
415-924-9411p

__._,_.___

Posted by: Lou Wirth <loutv@mindspring.com>
Reply via web post Reply to sender Reply to group Start a New Topic Messages in this topic (1)
this is the Avid-L2

.

__,_._,___

No comments:

Post a Comment