Thursday, January 21, 2016

Re: [Avid-L2] DnX 23.98 Project to 59.94 file

 

- open 23.98 project
- duplicate master sequence
- select all tracks, do a Video Mixdown
- edit the mixdown in to the sequence replacing all the V tracks
- open a 59.94 project
- open the bin from the 23.98 project
- open the mixdown sequence
- verify the motion adapter is adding correct pulldown
- select V track, do a Video Mixdown to desired output codec
- edit the mixdown in to the sequence replacing the V track
- output same-as-source QT

The first mixdown bakes in all your effects into a solid 23.98 block of video, and allows this sequence to be promoted to 59.94 in the 59.94 project. The second mixdown bakes in the pulldown.

On Thu, Jan 21, 2016 at 1:38 AM, jciron2005@yahoo.com [Avid-L2] <Avid-L2@yahoogroups.com> wrote:
 

Hi All,
This should be easy, but I'm checking with the brain trust anyway.
I have a 23.98 timeline and need to deliver a 59.94 file.
Reality TV, ... with lots of Timewarps I'm sure. GoPro etc.
I've done this on tape many times,  but this time I need to deliver a file.
What's the easiest, bestest workflow.
Avid 6.5 on PC

Thanks All

JC


__._,_.___

Posted by: Mark Spano <cutandcover@gmail.com>
Reply via web post Reply to sender Reply to group Start a New Topic Messages in this topic (2)
this is the Avid-L2

.

__,_._,___

No comments:

Post a Comment