Wednesday, September 24, 2014

Re: [Avid-L2] Re: Projects in Workspaces

 

With Unity, it made economic sense to separate the projects and media drive. Often you would mirror the projects workspace but not the media workspace.

With ISIS, all workspace are RAID 5 protected. There is still a reason to separate them,  such as is if you need to vary user permissions.

HTH




On 9/24/2014 6:27 PM, tcurren@aol.com [Avid-L2] wrote:
We also create a separate partition for every job with all assets and project on the same partition. This has worked for us for a very long time. (Terrablock)

__._,_.___

Posted by: "Dom Q. Silverio" <domqsilverio@gmail.com>
Reply via web post Reply to sender Reply to group Start a New Topic Messages in this topic (5)

.

__,_._,___

No comments:

Post a Comment