I used AMA to bring in a batch of clips from a 5D. I then selected clips and transcoded to my raid. When I began to use the clips with the script, the first TC was 4:10 and the clip was 2:32 in length. I discovered the original clip is actually 6:21 in clip. So then I started checking other clips and the durations are all shortened. Now I am confused. what could cause this?
Lou
Lou Wirth Productions
500Tamal Plaza, Suite 522
Corte Madera, CA 94925
www.louwirth.com
415-924-9411p
__._,_.___
Search the official Complete Avid-L archives at: http://archives.bengrosser.com/avid/
.
__,_._,___
No comments:
Post a Comment